Post-Construction Cleaning
Post-Construction Cleaning in Toronto
Construction dust, adhesive residue, paint overspray — post-construction cleanup requires specialized expertise. ClearView delivers deadline-driven post-construction cleaning that gets your space ready for occupancy.
Three-Phase Process
Phased Construction Cleaning
We structure our cleaning around your project timeline — rough, final, and touch-up phases.
Rough Clean
During active construction — removal of large debris, sweeping, and coarse dust management to maintain a safe worksite.
Final Clean
After trades are finished — deep cleaning of all surfaces, fixtures, windows, and floors to near-occupancy standard.
Touch-Up Clean
Just before handover or opening — removing fingerprints, dust migration, and last-minute marks for a move-in ready space.

What's Included
Complete Post-Construction Cleaning
- Construction dust removal — all surfaces
- Vacuuming and HEPA filtering
- Window and glass cleaning
- Paint overspray and adhesive removal
- Floor cleaning, polishing, or protection
- Fixture wiping — lights, vents, sockets
- Cabinet and millwork interior cleaning
- Washroom and kitchen deep-clean
- Debris hauling and disposal
- Sticker and label removal
- Final wipe-down and inspection
- Coordination with GC or PM on site access
Industries We Serve
Post-Construction Cleaning Across Sectors
Office Fit-Outs
Tenant improvement and office renovation cleanup, ready for move-in.
Retail Build-Outs
Storefront and mall unit construction cleanup before grand opening.
Condo Common Areas
Post-renovation cleaning of lobbies, hallways, and amenity spaces.
Medical & Dental Clinics
Contamination-conscious cleaning for healthcare construction.
New Commercial Builds
First-time cleaning of newly constructed commercial facilities.
Restaurant Fit-Outs
Kitchen, FOH, and service area post-construction cleaning.
Why ClearView
Why Choose ClearView for Post-Construction
Construction-Specialized Team
Our post-construction crews are trained differently from regular cleaners — they know how to handle drywall dust, silica, adhesives, and construction residue safely.
HEPA Equipment
We use HEPA-filtered vacuums and air scrubbers to capture fine construction dust particles that a regular vacuum would just recirculate.
Deadline-Driven
We understand you have a handover or opening date. We work to your timeline — including nights, weekends, and tight windows.
Coordination with Your GC
We work directly with general contractors and project managers to schedule each cleaning phase with minimal disruption to active trades.
FAQ
Common Questions
How much does post-construction cleaning cost in Toronto?
Post-construction cleaning is priced per square foot and depends on the scope of work and condition of the site. Most commercial projects range from $0.25–$0.75/sq ft for final clean. We provide custom quotes after a walkthrough or photos.
How long does post-construction cleaning take?
A 2,000 sq ft office final clean typically takes 8–16 hours. Larger or more complex spaces are quoted based on a site assessment.
Do you remove construction debris?
We remove and dispose of small debris during cleaning. Large-scale waste removal (dumpsters, structural debris) is outside our scope — but we coordinate closely with your GC.
Can you work around active construction?
Yes. Rough cleans and phased cleaning can be performed while trades are still on site. We schedule around your project milestones.
Do you serve all of Toronto and the GTA?
Yes. We service post-construction cleaning throughout Toronto, Scarborough, North York, Mississauga, Markham, Etobicoke, and surrounding areas.
Get a Quote
Ready for Post-Construction Cleanup?
Tell us about your project and we'll get you a quote fast. On-site walkthroughs available across the GTA.